Feasibility study development for a microgrid system in Lviv region

Today, distributed generation has become a key tool for businesses that seek autonomy, energy security, and new opportunities for profit. Each project in this area is unique, and quick assessments “on paper” often do not coincide with reality. That is why the development of a feasibility study (FES) is a critical stage before starting investments.

We were approached by a Customer who was considering options for building microgram system in Lviv region. One of the main tasks was to determine the real payback period for investments. As a result of professional analysis, a payback period of 29 months was calculated – an objective period, unlike the “advertising” 18 months declared by equipment suppliers.

Feasibility study is not a formality, but a series of painstaking technical studies:

  • Grid integration: on-site meetings with electricity distribution system operators and local gas networks to assess the technical conditions for connection.
  • Field studies: analysis of the location, geodetic surveys and the current state of the infrastructure.
  • Engineering audit: assessment of real needs in the reconstruction of buildings and the installation of engineering networks.

We provide the customer with not just a forecast, but a basis for making informed financial decisions.

Planning your own power generation? Start with the right calculations together with professionals.